亚播直播app下载安装

 Beijing Zhonghuan environmental quality monitoring center professional third party environmental monitoring and testing agency
?
Current position: approval items of administrative license: completion acceptance of environmental protection facilities of construction projects
Approval items of administrative license: completion acceptance of environmental protection facilities of construction projects
Release date: August 7, 2017 15:29:29 source: Beijing Municipal Government Portal editor: Zhonghuan Institute of physics and technology
Name of license:
Completion acceptance of environmental protection facilities of construction project
Item category:
administrative licensing
Setting basis:
Article 20 of regulations on the administration of environmental protection of construction projects
Article 9 of management measures for environmental protection acceptance of completed construction projects
License conditions:
1. In the early stage of the construction project, the environmental protection examination and approval procedures are complete, and the technical data and environmental protection archives are complete;
2. The environmental protection facilities and other measures have been completed or implemented in accordance with the requirements of the approved environmental impact assessment documents and design documents. The environmental protection facilities have passed the load test run, and their pollution prevention and control capacity can meet the needs of the main project;
3. The installation quality of environmental protection facilities conforms to the professional engineering acceptance specifications, regulations and inspection and evaluation standards issued by the state and relevant departments;
4. Have the conditions for normal operation of environmental protection facilities, including: trained and qualified operators, sound post operation procedures and corresponding rules and regulations, supply of raw materials and power, and meet other requirements for delivery and use;
5. The pollutant discharge conforms to the standards and approved total pollutant emission control indexes proposed in environmental impact assessment documents and design documents;
6. The ecological protection measures are implemented according to the requirements of the environmental impact assessment document, and the restoration measures have been taken for the damaged and recoverable environment in the construction process;
7. The environmental monitoring items, locations, institutions and staffing meet the requirements of environmental impact assessment documents and relevant regulations;
8. According to the environmental impact assessment document, it is necessary to verify the environmental impact of sensitive points of environmental protection, assess the indicators of clean production, and supervise the implementation of environmental protection measures during the construction period;
9. If the environmental impact assessment documents require the construction unit to take measures to reduce the emission of pollutants from other facilities or require the local government or relevant departments at the place where the construction project is located to take "regional reduction" measures to meet the requirements of total pollutant control, the corresponding measures shall be implemented.
For construction projects that meet the acceptance standards, the competent administrative department of environmental protection shall approve the application report for environmental protection acceptance of completed construction projects, the application form for environmental protection acceptance of completed construction projects or the registration card for environmental protection acceptance of completed construction projects.
Approved by:
Legal person, other organization
Implementation agency:
Municipal Environmental Protection Bureau, district and County Environmental Protection Bureau
Charging basis and standard:
There is no charge
Acceptance method:
On site acceptance
Place and contact information:
Beijing fixed assets investment project administrative examination and approval comprehensive service hall (northeast gate, 1 / F, block B, 70 zaolinqian street, Xicheng District, Beijing) 83978128
Dongcheng District administrative service center, 52 Jinbao Street, Dongcheng District 65258800-8356
3 / F, comprehensive administrative service center, 275 Xizhimen inner street, Xicheng District, 400010070
1 Xiaoyun Road, Chaoyang District 84681150
4 / F, 67 Fushi Road, Haidian District 68465956
No.20 Qilizhuang Road, Fengtai District 63860629
Project 685 Shijingshan District
Room 202, North building, 8 Gucheng Road, Shijingshan District (radiation project in Shijingshan District) 88918570
Government investment promotion service hall, 72 Binhe Road, Mentougou District 69859428
Comprehensive administrative service center, No.38 Haotian North Street, Changyang, Fangshan District 60342022
5 Binhui North 2nd Street, Yongshun Town, Tongzhou District 69514027
Economic Service Center, No. 6, Fuqian West Street, Shunyi District
No.29812, no.2960415, Daxing street, Xinhua
Comprehensive administrative service center, No. 22, Longshui Road, Changping District
Comprehensive administrative service center, 13 Linyin North Street, Pinggu District 89994847
Comprehensive administrative service hall, 33 Kaikai Road, Huairou District, 69687712
Xindong Road, Miyun County, 69069651, northwest of Xindong ring Island
69140541, 1st floor, bureau of industry and commerce, No.70 Dongwai street, Yanqing County
Second floor of podium, block B, Yicheng International Tower, No. 10, Ronghua Middle Road, Beijing Economic and Technological Development Zone (administrative service center of Beijing Economic and Technological Development Zone) 67857533
Time of acceptance:
Comprehensive service hall for administrative approval of fixed asset investment projects in Beijing: 9:00-12:00, 13:30-17:30 from Monday to Friday (except for legal holidays)
Please consult the local environmental protection bureau for processing time
Time limit:
30 days
License form:
A written approval document for approving the administrative license;
The written decision on refusing the administrative license shall state the reasons and inform the applicant that he has the right to apply for administrative reconsideration or bring an administrative lawsuit according to law.
License change:
License renewal:
Handling department:
Municipal Environmental Supervision Corps
Application materials:
1、 Copy of approval for environmental protection of construction project one Environmental protection of construction project completion Three Simultaneities Acceptance registration form four share
2、 For construction projects that prepare environmental impact reports, the application for environmental protection acceptance of completed construction projects shall be submitted four For construction projects with environmental impact report, the application for environmental protection acceptance of construction project completion shall be submitted four For the construction projects that fill in the environmental impact registration form, the registration card for environmental protection acceptance of completed construction projects shall be submitted four share
3. The construction unit shall submit the environmental protection acceptance monitoring report (table) for the construction project that mainly causes pollution and harm to the environment due to the discharge of pollutants. For the construction projects that mainly affect the ecological environment, the construction unit shall submit the environmental protection acceptance investigation report (table).
Demonstration text:
Application for environmental protection acceptance of completed construction project
"Three Simultaneities" of environmental protection after completion of construction project Acceptance registration form (radiation project)
Application registration card for environmental protection acceptance of completed construction project (electromagnetic radiation and electromagnetic induction)
Application registration card for environmental protection acceptance of nuclear technology application project
Approval process:
Acceptance, examination, approval and delivery
Review method:
Written review, field review
Specific ways to collect opinions from all walks of life are as follows:
http://www.bjepb.gov.cn ??

Key words: environmental protection facilities completion acceptance of construction projects

Beijing Central Environmental Quality Monitoring Center
Free telephone: 4008861860
Laboratory Tel: 010-56546165 010-56546168
Fax: 010-56546167
Address: Building 2, zhongfuli palace brand base, Fengtai District, Beijing

Wechat public account

Zhonghuan Wuyan microblog
Copyright? 2002-2020 jcx0515.com all rights reserved Beijing ICP Bei 18052291-2